
Our products are tested for safety by TüV Rheinland Group
MOBILE wind tunnel on semitrailer operates on diesel engine and is independent of energy sources. It is easy to transport, set-up takes just 5 hours and you are ready for operations. Mobile tunnel is an ideal solution for outdoor concerts, large events, corporate happenings, product launching or any other happening.
Tunnel specification
| Available for rent: | from December 2009 |
|---|---|
| Current location: | Latvia, Europe |
| Tunnel type: | open air tunnel mobile - built in on the semitrailer |
| Usage type: | entertainment |
| Flying experience: | Open air |
| Engine type: | diesel |
| Number of engines: | 1 |
| Diameter of flight area: | 2,8 m (9 ft) |
| Velocity: | up to 53 m/s (190 km/h) |
| Users: | 1-2 people at a time |
| User's max weight: | 100 kg |
| Flying height: | up to 15 meters |
| Power source: | 800 HP diesel engine for independent power source |
| MAX diesel consumption: | 120 l/h |
| AVG diesel consumption: | 100 l/h |
| Noise level: | in flight area: 115dBA beside wall: 83dBA 50m from tunnel: below 75dBA |
| Assembling time: | Max in 5 hours |
| Disassembling time: | Max in 3 hours |
| Dimensions with noise reduction wall: | 15 x 12 x 4 m |
| Dimensions when installed: | 13,79 x 7,76 x 4 m |
| Dimensions when on the road: | 13,79 x 3 x 4 m |
| Cushions: | heavy duty PVC, inflatable, UV treated |
| Structure: | Steel |
| Transportation: | 1 x semitrailer for tunnel 1 x semitrailer or 20ft container for noise wall |












