2009.09.14.
New AERODIUM HYBRID wind tunnel in Copenhagen in 2010
AERODIUM, manufacturer of vertical wind tunnels for body flying and indoor skydiving has signed agreement with Danish company about production, supply and installation of AERODIUM OPEN MULTI engine HYBRID wind tunnel.
AERODIUM tunnel will be located 20km from the Capital of Denmark Copenhagen. It is expected to start operation in early spring of 2010 and operate the tunnel 8 months through the year.
This will be the first in the World ever produced AERODIUM OPEN MULTI engine HYBRID wind tunnel which will allow flying in two different environments - closed Wall to Wall environment and open air environment. This tunnel will be multi engine driven for entertainment body flying purposes.






